Energy Engineering Thai Co., Ltd. Training Course
Item | Course Title | Days | Course Content |
1 | Best Practice and Detail for Power Plant Operation. | 3 | Management and Direction of Operation, Conduct of Operation, Procedure and Documentation, Facility and Equipment, Plant Status Management. Skill and Knowledge. |
2 | Generator And Transformer Protection System | 2 | Introduction and General Philosophy, Phasor and Polarity, Input Source to Relay (CT./PT.), Protective Fundamental (Individual Relay),Generator Protection, Transformer Protective, Open Discussion |
3 | Power Plant Process Control | 2 | Introduction To Process Control, Process characteristic, Feedback controller mode, PID Control Action, PID. Controller utilization, Application Combination Control System. |
4 | Control Valve Maintenance and Adjusting. | 2 | Introduction To Control Valve, Control Valve Terminology, Flashing and Gravitation, Flow characteristic of Control Valve, Maintenance and NDT., Control Valve action and Adjusting., Lab (If require). |
5 | Boiler and Turbine Protection System | 2 | Fundamental, Function of Boiler, Turbine Protection, Standard for Boiler and Turbine Protection, Case of Protection Failure. |
6 | Energy Saving for Coal Fired Power Plant. | 4 | Introduction, Energy Saving: Boiler, Turbine, Motor, Transformer , Compressor, Air Conditioning System, Lighting System, Energy Recovery., Case of Energy Saving in Power Plant. |
7 | Excitation, Automatic Voltage Regulator (AVR.) | 2 | Principle, Generator Behavior with Excite System , Operation , Maintenance and Commissioning |
8 | Step Factor And Loss Analysis | 2 | Target Turbine Heat Consumption and Exhaust Pressure Correction Factor, Target Radiation Heat Loss from Steam & Feed Range and Target On-Load Make-up Heat Consumption, Target Boiler Efficiency, Target Off-Load Heat Allowance & Target Work Electricity, STEP Factor Calculation, Concept of Losses & Definition of Losses, Details of Loss, Loss Analysis Calculation. |
9 | Power Plant Efficiency | 2 | Principle, Boiler and Turbine Efficiency, Plant Efficiency. |
10 | Test for Electrical Equipment | 3 | Test for Generator, HV. Motor, Power Transformer, HV. Circuit Breaker, Lightning Arrester & Surge Arrester, Current Transformer, Voltage Transformer, Surge Capacitor, Isolate Phase Bus Duct & Non-Surged Phase Bus Duct, HV. Cable. |